|
Board Meetings:
Cambria Community Services District Home Page
New:
CCSD Municipal Code
Lateral locations and Sewer Hookups
For waiting list or new building
information call (805) 927-6223 or visit the
www.cambriacsd.org
website.
Information about lateral location for a sewer hookup or collection system flows can be
obtained at the Wastewater Treatment Plant. Please bring the specific owner name and
address along with the lot, block, and parcel number. As-built maps and revisions
may not be current so information is not given out over the telephone.
New hookups to the collection system must be done by
contractors who have posted bonds with the district.
Currently bonded contractors.
Hartzell Backhoe
Service
Office: (805) 995-1991 |
Wright
Construction
Tom Wright (805) 927-3646
Bob
Wright (805) 927-5249 |
Steve Victor
Backhoe Service
Office: (805) 772-5521 |
Robert B. Enns
Construction, Inc. Office: (805)
995-1112 |
New lateral hookups must be inspected. Your contractor must call 24 hours in
advance before installation of any lateral to make sure someone can inspect it. All
paperwork and fees must be paid before hookup and inspection takes place. For this and other related information please call (805) 927-6253 or
(805) 927-6250.
Wastewater Treatment Plant Business hours are 9:00 AM to 4:00 PM.Collection System E-mail: andydreyfus@cambriacsd.org
|